49151 Concrete Technology And Practice Autumn 2019 Assignment 2 For The Structure Gi 3156308

49151 Concrete Technology and Practice, Autumn 2019 Assignment 2 For the structure given in Assignment 1, you are to set up a precast manufacturing yard on-shore. Multiple pumps have to be used in a co-ordinated manner, to achieve an output of 400m3 per hour. A typical yard and structural components are shown below. Figure 1 Typical on-shore pre-cast yard Figure 2 One of the main components of the bridge sub-structure Figure 3 A component of the bridge superstructure (i) Explain with diagrams how these units can be constructed towed and placed in position. (ii) Explain measures taken to ensure 100 year design life. (iii) A group report (4 students per group) is to be produced which will include the mix design you have chosen (from Assignment 1), casting and curing of the precast units, any monitoring used to ensure satisfactory rate of strength development, towing and placing the sub-structure units, towing and placing the super-structure units. (iv) Comment on the foundation preparation (if any) for the pier bases in sea water. 01 May 2019 Document Preview:

49151 Concrete Technology and Practice, Autumn 2019 Assignment 2 For the structure given in Assignment 1, you are to set up a precast manufacturing yard on-shore. Multiple pumps have to be used in a co-ordinated manner, to achieve 3an output of 400m per hour. A typical yard and structural components are shown below. Figure 1 Typical on-shore pre-cast yard Figure 2 One of the main components of the bridge sub-structureFigure 3 A component of the bridge superstructure (i) Explain with diagrams how these units can be constructed towed and placed in position. (ii) Explain measures taken to ensure 100 year design life. (iii) A group report (4 students per group) is to be produced which will include the mix design you have chosen (from Assignment 1), casting and curing of the precast units, any monitoring used to ensure satisfactory rate of strength development, towing and placing the sub-structure units, towing and placing the super-structure units. (iv) Comment on the foundation preparation (if any) for the pier bases in sea water. 01 May 2019

Connect with a professional writer in 5 simple steps

Please provide as many details about your writing struggle as possible

Academic level of your paper

Type of Paper

When is it due?

How many pages is this assigment?

Attachments:

49151-Assignm….pdf